l:\wpb_\wpb_emp1\w1200.13\p.m. project #1\00000-083091.docx PROJECT MANUAL East Central Regional Water Reclamation Facility Emergency Po
07/27/10 01720-2 2. Top elevation of headwalls, structures, and concrete caps. 3. Drainage Control Structures, Baffles, and Weirs. Obtain
PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 14 of 14 Process
COMPLETE REVISIONApril 2005Process Industry PracticesElectricalPIP ELSWC03600-Volt Power and Control Cable Specification
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the
COMPLETE REVISIONApril 2005Process Industry Practices Page 1 of 6Process Industry PracticesElectricalPIP ELSWC03600-Volt Power and Control Cable Speci
PIP ELSWC03COMPLETE REVISION600-Volt Power and Control Cable Specification April 2005Page 2 of 6 Process Industry Practices1. Introduction1.1 Purpose
COMPLETE REVISIONPIP ELSWC03April 2005 600-Volt Power and Control Cable SpecificationProcess Industry Practices Page 3 of 63. Definitionspurchaser: Th
PIP ELSWC03COMPLETE REVISION600-Volt Power and Control Cable Specification April 2005Page 4 of 6 Process Industry Practices4.1.3.4 If specified on th
COMPLETE REVISIONPIP ELSWC03April 2005 600-Volt Power and Control Cable SpecificationProcess Industry Practices Page 5 of 64.2 Inspection and Testing4
PIP ELSWC03COMPLETE REVISION600-Volt Power and Control Cable Specification April 2005Page 6 of 6 Process Industry Practicesc. This Practice, PIP ELSW
EDITORIAL REVISION February 2006 Process Industry Practices Electrical PIP ELSWC07 Shielded Power Cable Specification (5 to 46 kV)
07/27/10 01720-3 4. Location of water services, valves, fittings, hydrants, blowoff points, etc. by stationing and offsetting from wastewater m
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared
EDITORIAL REVISION February 2006 Process Industry Practices Page 1 of 7 Process Industry Practices Electrical PIP ELSWC07 Shielded Power Cable Sp
PIP ELSWC07 EDITORIAL REVISION Shielded Power Cable Specification (5 to 46 kV) February 2006 Page 2 of 7 Process Industry Practices 1. Introduction
EDITORIAL REVISION PIP ELSWC07 February 2006 Shielded Power Cable Specification (5 to 46 kV) Process Industry Practices Page 3 of 7 • Underwriters
PIP ELSWC07 EDITORIAL REVISION Shielded Power Cable Specification (5 to 46 kV) February 2006 Page 4 of 7 Process Industry Practices 4.1.4.2 Nonmet
EDITORIAL REVISION PIP ELSWC07 February 2006 Shielded Power Cable Specification (5 to 46 kV) Process Industry Practices Page 5 of 7 4.1.8 Armor Ass
PIP ELSWC07 EDITORIAL REVISION Shielded Power Cable Specification (5 to 46 kV) February 2006 Page 6 of 7 Process Industry Practices 4.3 Shipping 4.
EDITORIAL REVISION PIP ELSWC07 February 2006 Shielded Power Cable Specification (5 to 46 kV) Process Industry Practices Page 7 of 7 i. Descriptive
June 2007 Process Industry Practices Electrical PIP ELSAP20 Low-Voltage Automatic Transfer Switch
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared fr
07/27/10 01720-4 E. Each Record Drawing sheet must include the surveyor’s name, company, address, license number, and date of field survey. F. Si
June 2007 Process Industry Practices Electrical PIP ELSAP20 Low-Voltage Automatic Transfer Switch Table of Contents 1. Introduction...
PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 1. Introduction 1.1 Purpose This Practice provides the requirements for low-voltage
June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch owner: The party that owns the facility wherein the low-voltage automatic transfer sw
PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 4.2.4 If closed transition transfer is specified on the purchaser’s PIP ELSAP20D D
June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch 4.3.3 Main contacts shall be manually driven. 4.3.4 Electrical ratings of the bypas
PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 4.4.6 LCD displays shall be provided with “System Status” screens that display cle
June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch b. Red light to indicate that an automatic transfer switch is connected to the alter
PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 4.6.1.6 Unless otherwise specified on the purchaser’s PIP ELSAP20D Data Sheet, fin
June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch 4.7.3 If specified on the purchaser’s PIP ELSAP20D Data Sheet, additional testing sh
PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch Table 2 – Documentation Requirements A With Bid B For Review C Final Certified D As
07/22/10 02072-1 SECTION 02072 MINOR DEMOLITION FOR REMODELING PART 1 GENERAL 1.01 SECTION INCLUDES A. Remove designated building e
ISSUED FOR: PROPOSAL PURCHASE AS BUILTFACILITY NAME/LOCATION:ITEM NAME: PURCHASER/LOCATION:ITEM TAG NO.: JOB NO.:SERVICE: PURCHASER ORDER NO.:UNIT: SU
COMPLETE REVISIONJuly 2004Process Industry PracticesElectricalPIP ELSGS01Design and Fabrication ofHigh-Resistance Grounding System(600 Volts or Below)
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the
COMPLETE REVISIONJuly 2004Process Industry Practices Page 1 of 11Process Industry PracticesElectricalPIP ELSGS01Design and Fabrication ofHigh-Resistan
PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 2 of 11 Process Industry Pra
COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 3
PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 4 of 11 Process Industry Pra
COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 5
PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 6 of 11 Process Industry Pra
COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 7
08/11/10 02108-1 SECTION 02108 VIDEO-RECORDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Video-recording the pre-construction cond
PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 8 of 11 Process Industry Pra
COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 9
PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 10 of 11 Process Industry Pr
COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 1
March 2001Process Industry PracticesElectricalPIP ELTFT01Field Inspection and Testing ofNew Electrical Equipment
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the
March 2001Process Industry Practices Page 1 of 23Process Industry PracticesElectricalPIP ELTFT01Field Inspection and Testing ofNew Electrical Equipmen
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentPage 2 of 23 Process Industry Practices11.Medium-Voltage MCCs...
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 3 of 231. Introduction1.1. PurposeThis
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 4 of 23– IEEE 576-2000 - Recommended Prac
08/11/10 02108-2 G. Camera Control: Control camera pan, tilt, zoom-in and zoom-out rates such that recorded objects will be clearly vi
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 5 of 234.5 The Tester shall be responsi
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 6 of 23Transformer (V) Liquid (Oil) Dry0
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 7 of 235.3 The oil in all oil-filled eq
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 8 of 235.7 Minimum acceptable polarizatio
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 9 of 234. Switchrack, transformer, and
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 10 of 237.2.13 Inspect lubrication of bre
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 11 of 237.4 Function Test Items7.4.1 Fu
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 12 of 238.3. Testing Requirements8.3.1 Al
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 13 of 239.1.2 Check cable support syste
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 14 of 232. Test each conductor including
07/22/10 03001-1 SECTION 03001 CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Formwork. B. Concrete reinforcement and accessories.
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 15 of 233. Verify that proper tapes are
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 16 of 2311.1.8 Check PT and CT ratios.11.
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 17 of 2311.3.3 Test insulation resistan
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 18 of 2312.1.4 Check motor shaft for free
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 19 of 2312.4.3 For motors rated over 60
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 20 of 2313.3 Testing Requirements13.3.1 T
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 21 of 2314.1.5 Check starter main and a
PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 22 of 2315. Panelboards and Lighting Syst
PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 23 of 2315.4.3 Verify proper operation
07/22/10 03001-2 PART 2 PRODUCTS 2.01 FORM MATERIALS A. Conform to ACI 347. 2.02 REINFORCING STEEL A. Reinforcing Bars: ASTM A615
07/22/10 03001-3 PART 3 EXECUTION 3.01 FORMWORK ERECTION A. Conforms to the shapes, lines, and dimensions of the members as called for on
07/22/10 03001-4 more than one in six, and in the case of tied columns, space the ties not more than 3 inches on center for a distance of one foot
08/20/10 SI-1 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SPECIFICATIONS-TOC.docx SPECIFICATIONS TABLE OF CONTENTS SECTION NO. O
07/22/10 03001-5 A. Notify Engineer a minimum of 24 hours prior to commencement of concreting operations. B. Equipment for chuting, pumping
07/22/10 03001-6 B. A shorter mixing time than specified in ASTM C94 may be required. When the air temperature is between 85 and 90 degrees F,
07/22/10 03001-7 E. Cure specimens under laboratory conditions except that when in the opinion of the Engineer, there is a possibility of the s
08/20/10 04220-1 SECTION 04220 CONCRETE UNIT MASONRY PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete masonry units. B. Mortar.
08/20/10 04220-2 PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field conditions are acceptable and are ready to receive Work. B.
10/15/91 09220-1 SECTION 09220 PORTLAND CEMENT STUCCO PART 1 GENERAL 1.01 SECTION INCLUDES A. Portland cement stucco system. 1.02
10/15/91 09220-2 B. Verify joints are cut flush and surface is ready to receive Work of this Section. Verify no bituminous or water re
08/04/10 09900-1 SECTION 09900 PAINTING PART 1 GENERAL 1.01 SECTION INCLUDES A. Surface preparation and application
08/04/10 09900-2 7. SP-8 Shop Pickled: Complete removal of rust and mill scale by acid pickling, duplex pickling or elec
08/04/10 09900-3 D. Primers and other undercoat paint must be produced by same manufacturer as finish coats. E. Use on
01001-1 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc Engineer’s Proj. PROJECT: East Centra
08/04/10 09900-4 45% 4 13 21 29 37 47 56 64 73 82 91 -----------------------------------------------------
08/04/10 09900-5 2.02 MATERIALS A. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a soft p
08/04/10 09900-6 Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughl
08/04/10 09900-7 F. Brushing or rolling is to be done so that a smooth coat as nearly uniform in thickness as possible is o
08/04/10 09900-8 1. Two coats Series 113 H.B. Tnemec-Tufcoat water base acrylic epoxy. Apply at a minimum rate of 120-170 sq
08/04/10 09900-9 3. Full first coat Tnemec Series N69 Hi-Build Epoxoline epoxy polyamide, 2-3 mils DFT. 4. Finish co
08/04/10 09900-10 Polymers or Coagulant Aids Orange with Green Band Potassium Permanganate Violet S
16201-1 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc SECTION 16201 DIESEL STANDBY GENERATOR PART 1 GENERAL
16201-2 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 1.03 CODES A. All equipment shall be provided per th
16201-3 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 10. Legends for all devices on all diagrams. 11. S
01001-2 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc D. Contractor shall be responsible for verif
16201-4 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc PART 2 PRODUCTS 2.01 ENGINE A. Engine shall be wat
16201-5 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc B. The generator shall be capable of delivering rated ou
16201-6 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc and braced to prevent weight or thermal growth from bein
16201-7 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc an industrial pre-manufactured stainless steel constructi
16201-8 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc D. Battery Charger – Current limiting battery charger sh
16201-9 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc Low oil pressure ALARM Oil pressure sender failure
16201-10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 2.08 MAIN LINE CIRCUIT BREAKER A. Unit shall be pr
16201-11 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc A. Provide unit to shunt trip the remote main breaker a
16201-12 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc A. Unit shall be installed in accordance with Manuf
16201-13 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 2. Test shall utilize resistive load banks for the full
01001-3 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc B. When the Bid Form includes a separate pay
16201-14 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 1. Iron 2. Chromium 3. Copper 4. Aluminum 5. S
16621-1 SECTION 16621 ELECTRICAL AND BUILDING MODIFICATIONS FOR CONTROLS, STARTING AND FUEL SYSTEMS RETROFIT FOR GAS TURBIN
16621-2 attendance shall be performed during daylight hours (7:00 a.m. to 7:00 p.m.), unless prior approval from the Engineer
16621-3 5. Install transfer switch and 480V distribution panel at specified location inside control room. 6. Install condui
16621-4 1.08 GUARANTEE: The Contractor guarantees that the work and service to be performed under the Contract and all wor
16621-5 a. Cable transition to VPI Dry Type; Standard (XF – HV on left) b. Distribution class arrestor c. Current limiting
16621-6 generator will be supplied with a DC battery start system and DC battery charging system in accordance with Specifica
16721-1 11/21/2012 10:16 AM SECTION 16721 VIDEO SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. This section of the speci
16721-2 11/21/2012 10:16 AM 2. Cameras shall provide 1920x1080p HD video capability with H.264 HD video standard compatibil
16721-3 11/21/2012 10:16 AM 5. IV&C outdoor rated surge protection. 6. LW productivity suite 7. LW viewer, so that
01001-4 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc all interested parties are present or waived th
16721-4 11/21/2012 10:16 AM 3. Show layout, configurations, and terminations. C. Manuals 1. Submit simultaneously
16721-5 11/21/2012 10:16 AM preventive maintenance schedule describing the protocol for preventive maintenance. The schedule
16721-6 11/21/2012 10:16 AM B. All conduit, junction boxes, conduit supports and hangers shall be concealed in finished ar
November 2002Process Industry PracticesElectricalPIP ELCGL01Electrical Design Criteria
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the
November 2002Process Industry Practices Page 1 of 20Process Industry PracticesElectricalPIP ELCGL01Electrical Design CriteriaTable of Contents1. Intro
PIP ELCGL01Electrical Design Criteria November 2002Page 2 of 20 Process Industry Practices10.2 480-Volt Receptacles ...1510.3 Spec
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 3 of 201. Introduction1.1 PurposeThis Practice defines general requ
PIP ELCGL01Electrical Design Criteria November 2002Page 4 of 20 Process Industry Practices– PIP ELSAP16 - Design and Fabrication of Valve Regulated Le
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 5 of 20– PIP ELSTR03 - Design and Fabrication of Ventilated Dry-Typ
01001-5 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc construction process. These items are to be av
PIP ELCGL01Electrical Design Criteria November 2002Page 6 of 20 Process Industry Practices• National Electrical Manufacturers Association (NEMA)–NEMA
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 7 of 203.4 Utility Interface ParametersUtility interface parameters
PIP ELCGL01Electrical Design Criteria November 2002Page 8 of 20 Process Industry Practices3.8 Design Allowance3.8.1 New electrical systems shall be de
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 9 of 203.11.2 Doors shall be equipped with panic hardware and shall
PIP ELCGL01Electrical Design Criteria November 2002Page 10 of 20 Process Industry Practices5.3 Transformers5.3.1 The system power transformers shall b
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 11 of 205.5.2 Medium-voltage switchgear shall be metal-clad drawout
PIP ELCGL01Electrical Design Criteria November 2002Page 12 of 20 Process Industry Practices7.2.3 If an MCC must be located in a building or room withi
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 13 of 207.4.5 Where medium-voltage adjustable speed drives are requ
PIP ELCGL01Electrical Design Criteria November 2002Page 14 of 20 Process Industry Practicesa. adjacent building or structure steelb. reinforcing mesh
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 15 of 209.2 Luminaires and Circuits9.2.1 Luminaire type and voltage
01001-6 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc 19.0 TEMPORARY CONTROLS AND FACILITIES A. Th
PIP ELCGL01Electrical Design Criteria November 2002Page 16 of 20 Process Industry Practices10.3 Specialty ReceptaclesReceptacles for use at voltages o
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 17 of 2011.2.4 All conduit connections to cabinets and junction box
PIP ELCGL01Electrical Design Criteria November 2002Page 18 of 20 Process Industry PracticesThis does not apply to single or double conduit duct banks
PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 19 of 2014.2 Heat-tracing system components shall be supplied as sp
PIP ELCGL01Electrical Design Criteria November 2002Page 20 of 20 Process Industry Practices16.3 When specified on the Data Sheet, standby power shall
COMPLETE REVISIONOctober 2004Process Industry PracticesElectricalPIP ELSSG01Design and Fabrication ofLow-Voltage Metal-EnclosedAC Power Circuit Breake
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the
COMPLETE REVISIONOctober 2004Process Industry Practices Page 1 of 14Process Industry PracticesElectricalPIP ELSSG01Design and Fabrication ofLow-Voltag
PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 2 of 14 Process
COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac
07/27/10 01720-1 SECTION 01720 RECORD DOCUMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. On site maintenance of Record Documents. B. Re
PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 4 of 14 Process
COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac
PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 6 of 14 Process
COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac
PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 8 of 14 Process
COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac
PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 10 of 14 Process
COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac
PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 12 of 14 Process
COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac