l:\wpb_\wpb_emp1\w1200.13\p.m. project #1\00000-083091.docx
PROJECT MANUAL
East Central Regional Water Reclamation Facility
Emergency Power Plant Upgrades
Electrical Systems and Structural Project
Project #1
September 2012
Prepared by:
Mock, Roos & Associates, Inc.
Engineers-Surveyors-Planners
5720 Corporate Way
West Palm Beach, Florida
Engineer's Project
No. W1200.13
Page view 0
1 2 3 4 5 6 ... 167 168

Summary of Contents

Page 1 - Prepared by:

l:\wpb_\wpb_emp1\w1200.13\p.m. project #1\00000-083091.docx PROJECT MANUAL East Central Regional Water Reclamation Facility Emergency Po

Page 2

07/27/10 01720-2 2. Top elevation of headwalls, structures, and concrete caps. 3. Drainage Control Structures, Baffles, and Weirs. Obtain

Page 3 - 01001-1

PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 14 of 14 Process

Page 4 - 01001-2

COMPLETE REVISIONApril 2005Process Industry PracticesElectricalPIP ELSWC03600-Volt Power and Control Cable Specification

Page 5 - 01001-3

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the

Page 6 - 01001-4

COMPLETE REVISIONApril 2005Process Industry Practices Page 1 of 6Process Industry PracticesElectricalPIP ELSWC03600-Volt Power and Control Cable Speci

Page 7 - 01001-5

PIP ELSWC03COMPLETE REVISION600-Volt Power and Control Cable Specification April 2005Page 2 of 6 Process Industry Practices1. Introduction1.1 Purpose

Page 8 - 01001-6

COMPLETE REVISIONPIP ELSWC03April 2005 600-Volt Power and Control Cable SpecificationProcess Industry Practices Page 3 of 63. Definitionspurchaser: Th

Page 9 - 07/27/10 01720-1

PIP ELSWC03COMPLETE REVISION600-Volt Power and Control Cable Specification April 2005Page 4 of 6 Process Industry Practices4.1.3.4 If specified on th

Page 10 - 07/27/10 01720-2

COMPLETE REVISIONPIP ELSWC03April 2005 600-Volt Power and Control Cable SpecificationProcess Industry Practices Page 5 of 64.2 Inspection and Testing4

Page 11 - 07/27/10 01720-3

PIP ELSWC03COMPLETE REVISION600-Volt Power and Control Cable Specification April 2005Page 6 of 6 Process Industry Practicesc. This Practice, PIP ELSW

Page 12 - 07/27/10 01720-4

EDITORIAL REVISION February 2006 Process Industry Practices Electrical PIP ELSWC07 Shielded Power Cable Specification (5 to 46 kV)

Page 13 - 07/22/10 02072-1

07/27/10 01720-3 4. Location of water services, valves, fittings, hydrants, blowoff points, etc. by stationing and offsetting from wastewater m

Page 14 - 08/11/10 02108-1

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared

Page 15 - 08/11/10 02108-2

EDITORIAL REVISION February 2006 Process Industry Practices Page 1 of 7 Process Industry Practices Electrical PIP ELSWC07 Shielded Power Cable Sp

Page 16 - 07/22/10 03001-1

PIP ELSWC07 EDITORIAL REVISION Shielded Power Cable Specification (5 to 46 kV) February 2006 Page 2 of 7 Process Industry Practices 1. Introduction

Page 17 - 07/22/10 03001-2

EDITORIAL REVISION PIP ELSWC07 February 2006 Shielded Power Cable Specification (5 to 46 kV) Process Industry Practices Page 3 of 7 • Underwriters

Page 18 - 07/22/10 03001-3

PIP ELSWC07 EDITORIAL REVISION Shielded Power Cable Specification (5 to 46 kV) February 2006 Page 4 of 7 Process Industry Practices 4.1.4.2 Nonmet

Page 19 - 07/22/10 03001-4

EDITORIAL REVISION PIP ELSWC07 February 2006 Shielded Power Cable Specification (5 to 46 kV) Process Industry Practices Page 5 of 7 4.1.8 Armor Ass

Page 20 - 07/22/10 03001-5

PIP ELSWC07 EDITORIAL REVISION Shielded Power Cable Specification (5 to 46 kV) February 2006 Page 6 of 7 Process Industry Practices 4.3 Shipping 4.

Page 21 - 07/22/10 03001-6

EDITORIAL REVISION PIP ELSWC07 February 2006 Shielded Power Cable Specification (5 to 46 kV) Process Industry Practices Page 7 of 7 i. Descriptive

Page 22 - 07/22/10 03001-7

June 2007 Process Industry Practices Electrical PIP ELSAP20 Low-Voltage Automatic Transfer Switch

Page 23 - 08/20/10 04220-1

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared fr

Page 24 - 08/20/10 04220-2

07/27/10 01720-4 E. Each Record Drawing sheet must include the surveyor’s name, company, address, license number, and date of field survey. F. Si

Page 25 - 10/15/91 09220-1

June 2007 Process Industry Practices Electrical PIP ELSAP20 Low-Voltage Automatic Transfer Switch Table of Contents 1. Introduction...

Page 26 - 10/15/91 09220-2

PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 1. Introduction 1.1 Purpose This Practice provides the requirements for low-voltage

Page 27

June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch owner: The party that owns the facility wherein the low-voltage automatic transfer sw

Page 28

PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 4.2.4 If closed transition transfer is specified on the purchaser’s PIP ELSAP20D D

Page 29

June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch 4.3.3 Main contacts shall be manually driven. 4.3.4 Electrical ratings of the bypas

Page 30

PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 4.4.6 LCD displays shall be provided with “System Status” screens that display cle

Page 31

June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch b. Red light to indicate that an automatic transfer switch is connected to the alter

Page 32

PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch 4.6.1.6 Unless otherwise specified on the purchaser’s PIP ELSAP20D Data Sheet, fin

Page 33

June 2007 PIP ELSAP20 Low-Voltage Automatic Transfer Switch 4.7.3 If specified on the purchaser’s PIP ELSAP20D Data Sheet, additional testing sh

Page 34

PIP ELSAP20 June 2007 Low-Voltage Automatic Transfer Switch Table 2 – Documentation Requirements A With Bid B For Review C Final Certified D As

Page 35

07/22/10 02072-1 SECTION 02072 MINOR DEMOLITION FOR REMODELING PART 1 GENERAL 1.01 SECTION INCLUDES A. Remove designated building e

Page 36

ISSUED FOR: PROPOSAL PURCHASE AS BUILTFACILITY NAME/LOCATION:ITEM NAME: PURCHASER/LOCATION:ITEM TAG NO.: JOB NO.:SERVICE: PURCHASER ORDER NO.:UNIT: SU

Page 37

COMPLETE REVISIONJuly 2004Process Industry PracticesElectricalPIP ELSGS01Design and Fabrication ofHigh-Resistance Grounding System(600 Volts or Below)

Page 38

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the

Page 39

COMPLETE REVISIONJuly 2004Process Industry Practices Page 1 of 11Process Industry PracticesElectricalPIP ELSGS01Design and Fabrication ofHigh-Resistan

Page 40

PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 2 of 11 Process Industry Pra

Page 41

COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 3

Page 42

PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 4 of 11 Process Industry Pra

Page 43

COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 5

Page 44

PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 6 of 11 Process Industry Pra

Page 45

COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 7

Page 46

08/11/10 02108-1 SECTION 02108 VIDEO-RECORDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Video-recording the pre-construction cond

Page 47

PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 8 of 11 Process Industry Pra

Page 48

COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 9

Page 49

PIP ELSGS01COMPLETE REVISIONDesign and Fabrication of High-Resistance Grounding System (600 Volts or Below) July 2004Page 10 of 11 Process Industry Pr

Page 50

COMPLETE REVISIONPIP ELSGS01July 2004 Design and Fabrication of High-Resistance Grounding System (600 Volts or Below)Process Industry Practices Page 1

Page 51 - 16621-1

March 2001Process Industry PracticesElectricalPIP ELTFT01Field Inspection and Testing ofNew Electrical Equipment

Page 52 - 16621-2

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the

Page 53 - 16621-3

March 2001Process Industry Practices Page 1 of 23Process Industry PracticesElectricalPIP ELTFT01Field Inspection and Testing ofNew Electrical Equipmen

Page 54 - 16621-4

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentPage 2 of 23 Process Industry Practices11.Medium-Voltage MCCs...

Page 55 - 16621-5

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 3 of 231. Introduction1.1. PurposeThis

Page 56 - 16621-6

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 4 of 23– IEEE 576-2000 - Recommended Prac

Page 57 - 11/21/2012 10:16 AM

08/11/10 02108-2 G. Camera Control: Control camera pan, tilt, zoom-in and zoom-out rates such that recorded objects will be clearly vi

Page 58

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 5 of 234.5 The Tester shall be responsi

Page 59

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 6 of 23Transformer (V) Liquid (Oil) Dry0

Page 60

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 7 of 235.3 The oil in all oil-filled eq

Page 61

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 8 of 235.7 Minimum acceptable polarizatio

Page 62

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 9 of 234. Switchrack, transformer, and

Page 63 - Electrical Design Criteria

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 10 of 237.2.13 Inspect lubrication of bre

Page 64

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 11 of 237.4 Function Test Items7.4.1 Fu

Page 65

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 12 of 238.3. Testing Requirements8.3.1 Al

Page 66

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 13 of 239.1.2 Check cable support syste

Page 67

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 14 of 232. Test each conductor including

Page 68

07/22/10 03001-1 SECTION 03001 CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Formwork. B. Concrete reinforcement and accessories.

Page 69

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 15 of 233. Verify that proper tapes are

Page 70 - 3. System Design Criteria

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 16 of 2311.1.8 Check PT and CT ratios.11.

Page 71

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 17 of 2311.3.3 Test insulation resistan

Page 72

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 18 of 2312.1.4 Check motor shaft for free

Page 73 - 5. Power Distribution

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 19 of 2312.4.3 For motors rated over 60

Page 74

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 20 of 2313.3 Testing Requirements13.3.1 T

Page 75 - 7. Motor Control

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 21 of 2314.1.5 Check starter main and a

Page 76

PIP ELTFT01Field Inspection and Testing of March 2001New Electrical EquipmentProcess Industry Practices Page 22 of 2315. Panelboards and Lighting Syst

Page 77 - 8. Grounding

PIP ELTFT01March 2001 Field Inspection and Testing of New Electrical EquipmentProcess Industry Practices Page 23 of 2315.4.3 Verify proper operation

Page 78 - 9. Lighting

07/22/10 03001-2 PART 2 PRODUCTS 2.01 FORM MATERIALS A. Conform to ACI 347. 2.02 REINFORCING STEEL A. Reinforcing Bars: ASTM A615

Page 79

07/22/10 03001-3 PART 3 EXECUTION 3.01 FORMWORK ERECTION A. Conforms to the shapes, lines, and dimensions of the members as called for on

Page 80 - 11. Wiring Methods

07/22/10 03001-4 more than one in six, and in the case of tied columns, space the ties not more than 3 inches on center for a distance of one foot

Page 81

08/20/10 SI-1 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SPECIFICATIONS-TOC.docx SPECIFICATIONS TABLE OF CONTENTS SECTION NO. O

Page 82 - 13. Instrumentation

07/22/10 03001-5 A. Notify Engineer a minimum of 24 hours prior to commencement of concreting operations. B. Equipment for chuting, pumping

Page 83 - 15. Cathodic Protection

07/22/10 03001-6 B. A shorter mixing time than specified in ASTM C94 may be required. When the air temperature is between 85 and 90 degrees F,

Page 84 - 18. Lightning Protection

07/22/10 03001-7 E. Cure specimens under laboratory conditions except that when in the opinion of the Engineer, there is a possibility of the s

Page 85

08/20/10 04220-1 SECTION 04220 CONCRETE UNIT MASONRY PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete masonry units. B. Mortar.

Page 86 - September 1997 Issued

08/20/10 04220-2 PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field conditions are acceptable and are ready to receive Work. B.

Page 87 - Table of Contents

10/15/91 09220-1 SECTION 09220 PORTLAND CEMENT STUCCO PART 1 GENERAL 1.01 SECTION INCLUDES A. Portland cement stucco system. 1.02

Page 88

10/15/91 09220-2 B. Verify joints are cut flush and surface is ready to receive Work of this Section. Verify no bituminous or water re

Page 89

08/04/10 09900-1 SECTION 09900 PAINTING PART 1 GENERAL 1.01 SECTION INCLUDES A. Surface preparation and application

Page 90

08/04/10 09900-2 7. SP-8 Shop Pickled: Complete removal of rust and mill scale by acid pickling, duplex pickling or elec

Page 91

08/04/10 09900-3 D. Primers and other undercoat paint must be produced by same manufacturer as finish coats. E. Use on

Page 92

01001-1 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc Engineer’s Proj. PROJECT: East Centra

Page 93

08/04/10 09900-4 45% 4 13 21 29 37 47 56 64 73 82 91 -----------------------------------------------------

Page 94

08/04/10 09900-5 2.02 MATERIALS A. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a soft p

Page 95

08/04/10 09900-6 Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughl

Page 96

08/04/10 09900-7 F. Brushing or rolling is to be done so that a smooth coat as nearly uniform in thickness as possible is o

Page 97

08/04/10 09900-8 1. Two coats Series 113 H.B. Tnemec-Tufcoat water base acrylic epoxy. Apply at a minimum rate of 120-170 sq

Page 98

08/04/10 09900-9 3. Full first coat Tnemec Series N69 Hi-Build Epoxoline epoxy polyamide, 2-3 mils DFT. 4. Finish co

Page 99 - PIP ELSSG01

08/04/10 09900-10 Polymers or Coagulant Aids Orange with Green Band Potassium Permanganate Violet S

Page 100 - COMPLETE REVISION

16201-1 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc SECTION 16201 DIESEL STANDBY GENERATOR PART 1 GENERAL

Page 101 - PIP ELSWC03

16201-2 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 1.03 CODES A. All equipment shall be provided per th

Page 102 - April 2005 Complete Revision

16201-3 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 10. Legends for all devices on all diagrams. 11. S

Page 103

01001-2 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc D. Contractor shall be responsible for verif

Page 104 - 2. References

16201-4 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc PART 2 PRODUCTS 2.01 ENGINE A. Engine shall be wat

Page 105 - 4. Requirements

16201-5 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc B. The generator shall be capable of delivering rated ou

Page 106

16201-6 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc and braced to prevent weight or thermal growth from bein

Page 107

16201-7 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc an industrial pre-manufactured stainless steel constructi

Page 108

16201-8 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc D. Battery Charger – Current limiting battery charger sh

Page 109 - (5 to 46 kV)

16201-9 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc Low oil pressure ALARM Oil pressure sender failure

Page 110 - August 2005 Issued

16201-10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 2.08 MAIN LINE CIRCUIT BREAKER A. Unit shall be pr

Page 111

16201-11 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc A. Provide unit to shunt trip the remote main breaker a

Page 112

16201-12 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc A. Unit shall be installed in accordance with Manuf

Page 113

16201-13 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 2. Test shall utilize resistive load banks for the full

Page 114 - Conductor Size

01001-3 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc B. When the Bid Form includes a separate pay

Page 115

16201-14 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\SECTION 16201-Indoor Generator and ATS.doc 1. Iron 2. Chromium 3. Copper 4. Aluminum 5. S

Page 116

16621-1 SECTION 16621 ELECTRICAL AND BUILDING MODIFICATIONS FOR CONTROLS, STARTING AND FUEL SYSTEMS RETROFIT FOR GAS TURBIN

Page 117

16621-2 attendance shall be performed during daylight hours (7:00 a.m. to 7:00 p.m.), unless prior approval from the Engineer

Page 118 - PIP ELSAP20

16621-3 5. Install transfer switch and 480V distribution panel at specified location inside control room. 6. Install condui

Page 119 - June 2007 Issued

16621-4 1.08 GUARANTEE: The Contractor guarantees that the work and service to be performed under the Contract and all wor

Page 120

16621-5 a. Cable transition to VPI Dry Type; Standard (XF – HV on left) b. Distribution class arrestor c. Current limiting

Page 121

16621-6 generator will be supplied with a DC battery start system and DC battery charging system in accordance with Specifica

Page 122 - PIP ELSAP20

16721-1 11/21/2012 10:16 AM SECTION 16721 VIDEO SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. This section of the speci

Page 123 - PIP ELSAP20 June 2007

16721-2 11/21/2012 10:16 AM 2. Cameras shall provide 1920x1080p HD video capability with H.264 HD video standard compatibil

Page 124

16721-3 11/21/2012 10:16 AM 5. IV&C outdoor rated surge protection. 6. LW productivity suite 7. LW viewer, so that

Page 125

01001-4 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc all interested parties are present or waived th

Page 126

16721-4 11/21/2012 10:16 AM 3. Show layout, configurations, and terminations. C. Manuals 1. Submit simultaneously

Page 127

16721-5 11/21/2012 10:16 AM preventive maintenance schedule describing the protocol for preventive maintenance. The schedule

Page 128

16721-6 11/21/2012 10:16 AM B. All conduit, junction boxes, conduit supports and hangers shall be concealed in finished ar

Page 129

November 2002Process Industry PracticesElectricalPIP ELCGL01Electrical Design Criteria

Page 130 - ELSAP20D-D

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the

Page 131

November 2002Process Industry Practices Page 1 of 20Process Industry PracticesElectricalPIP ELCGL01Electrical Design CriteriaTable of Contents1. Intro

Page 132 - July 2004 Complete Revision

PIP ELCGL01Electrical Design Criteria November 2002Page 2 of 20 Process Industry Practices10.2 480-Volt Receptacles ...1510.3 Spec

Page 133 - July 2004

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 3 of 201. Introduction1.1 PurposeThis Practice defines general requ

Page 134

PIP ELCGL01Electrical Design Criteria November 2002Page 4 of 20 Process Industry Practices– PIP ELSAP16 - Design and Fabrication of Valve Regulated Le

Page 135

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 5 of 20– PIP ELSTR03 - Design and Fabrication of Ventilated Dry-Typ

Page 136

01001-5 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc construction process. These items are to be av

Page 137

PIP ELCGL01Electrical Design Criteria November 2002Page 6 of 20 Process Industry Practices• National Electrical Manufacturers Association (NEMA)–NEMA

Page 138

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 7 of 203.4 Utility Interface ParametersUtility interface parameters

Page 139

PIP ELCGL01Electrical Design Criteria November 2002Page 8 of 20 Process Industry Practices3.8 Design Allowance3.8.1 New electrical systems shall be de

Page 140

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 9 of 203.11.2 Doors shall be equipped with panic hardware and shall

Page 141

PIP ELCGL01Electrical Design Criteria November 2002Page 10 of 20 Process Industry Practices5.3 Transformers5.3.1 The system power transformers shall b

Page 142

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 11 of 205.5.2 Medium-voltage switchgear shall be metal-clad drawout

Page 143

PIP ELCGL01Electrical Design Criteria November 2002Page 12 of 20 Process Industry Practices7.2.3 If an MCC must be located in a building or room withi

Page 144 - New Electrical Equipment

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 13 of 207.4.5 Where medium-voltage adjustable speed drives are requ

Page 145

PIP ELCGL01Electrical Design Criteria November 2002Page 14 of 20 Process Industry Practicesa. adjacent building or structure steelb. reinforcing mesh

Page 146

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 15 of 209.2 Luminaires and Circuits9.2.1 Luminaire type and voltage

Page 147

01001-6 07/26/10 L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc 19.0 TEMPORARY CONTROLS AND FACILITIES A. Th

Page 148

PIP ELCGL01Electrical Design Criteria November 2002Page 16 of 20 Process Industry Practices10.3 Specialty ReceptaclesReceptacles for use at voltages o

Page 149 - 4. General

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 17 of 2011.2.4 All conduit connections to cabinets and junction box

Page 150 - 5. Acceptable Measurements

PIP ELCGL01Electrical Design Criteria November 2002Page 18 of 20 Process Industry PracticesThis does not apply to single or double conduit duct banks

Page 151 - Insulation Type k

PIP ELCGL01November 2002 Electrical Design CriteriaProcess Industry Practices Page 19 of 2014.2 Heat-tracing system components shall be supplied as sp

Page 152 - DC Test (kV)

PIP ELCGL01Electrical Design Criteria November 2002Page 20 of 20 Process Industry Practices16.3 When specified on the Data Sheet, standby power shall

Page 153 - 6. Grounding Systems

COMPLETE REVISIONOctober 2004Process Industry PracticesElectricalPIP ELSSG01Design and Fabrication ofLow-Voltage Metal-EnclosedAC Power Circuit Breake

Page 154 - 7. Medium-Voltage Switchgear

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICESIn an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the

Page 155

COMPLETE REVISIONOctober 2004Process Industry Practices Page 1 of 14Process Industry PracticesElectricalPIP ELSSG01Design and Fabrication ofLow-Voltag

Page 156 - 8. Power Transformers

PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 2 of 14 Process

Page 157 - 9. Shielded Power Cables

COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac

Page 158 - New Electrical Equipment

07/27/10 01720-1 SECTION 01720 RECORD DOCUMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. On site maintenance of Record Documents. B. Re

Page 159

PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 4 of 14 Process

Page 160 - 11. Medium-Voltage MCCs

COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac

Page 161

PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 6 of 14 Process

Page 162 - 12. Motors

COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac

Page 163

PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 8 of 14 Process

Page 164 - 13. Low-Voltage Switchgear

COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac

Page 165

PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 10 of 14 Process

Page 166

COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac

Page 167

PIP ELSSG01COMPLETE REVISIONDesign and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004Page 12 of 14 Process

Page 168

COMPLETE REVISIONPIP ELSSG01October 2004 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker SwitchgearProcess Industry Prac