API Audio Accessories 7-22-10 Specifications Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 168
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
07/27/10 01720-4
E. Each Record Drawing sheet must include the surveyor’s name, company, address, license
number, and date of field survey.
F. Signed and sealed Record Drawings shall be submitted with all pay applications and at the
conclusion of the Project.
3.02 CONTRACTOR RESPONSIBILITIES
A. Record document information not required to be obtained by a Professional Surveyor and Mapper
must be obtained by the Contractor.
B. Mark Record information on one clean set of prints of the Contract Documents.
C. Each Drawing must be stamped indicating that the information has been reviewed by the
Contractor.
D. Contractor’s Surveyor will transfer Contractor supplied information to the record drawing. (N/A)
END OF SECTION
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 167 168

Comments to this Manuals

No comments