01001-4
07/26/10
L:\wpb_\wpb_emp1\W1200.13\p.m. Project #1\01001-072610 Noboil.doc
all interested parties are present or waived their right to be present. Contractor shall provide, in
writing, seventy-two (72) hour notification for all items and equipment startups.
11.0 SALVAGEABLE MATERIAL
A. All salvageable material and/or equipment removed from the existing construction for which
specific use, relocation or other disposal is not specifically noted on the Drawings or otherwise
specified, will remain the property of the Owner and be turned over to him. All material and/or
equipment not in salvageable condition as determined by the Engineer, must be disposed of by
the Contractor. The actual storage site for salvageable material will be designated by the Owner.
12.0 BORING LOGS, OTHER REPORTS AND DRAWINGS UTILIZED BY ENGINEER
A. Boring Logs, other reports and Drawings utilized by Engineer, if attached at the end of these
Specifications, are provided for Contractor's information only and are not a part of the Contract
Documents. There is no technical data in the Boring Logs, other reports or Drawings that should
be relied on by the Contractor. There also were no other reports or drawings utilized by Engineer
in preparation of the Contract Documents that contained data that could be relied on by the
Contractor.
13.0 DISPOSAL OF EXCAVATED MATERIALS AND DEBRIS
A. All excess excavated material and debris not required for backfill (unless otherwise noted),
including but not limited to, broken pipe, sidewalks, curbs and other concrete items, together with
all roots, boards and other debris, are to be disposed of by the Contractor at an appropriate legal
site.
14.0 CONTRACTOR'S RESPONSIBILITIES
A. Supervise and direct the Work competently and efficiently, devoting such attention thereto and
applying such skills and expertise as may be necessary to perform the Work in accordance with
the Drawings and these Specifications. Be solely responsible for the means, methods,
techniques, sequences and procedures of construction. Be responsible to see that the finished
Work complies accurately with the Drawings and Specifications.
B. Provide competent, suitably qualified personnel to perform construction as required by the
Drawings and these Specifications.
C. Be responsible for initiating, maintaining and supervising all safety precautions and programs in
connection with the Work. Take all necessary precautions for the safety of, and provide the
necessary protection to prevent damage, injury or loss to:
1. All employees on the Work and other persons who may be affected thereby.
2. All the Work and all materials or equipment to be incorporated therein, whether in storage on
or off the site, and
3. Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures and utilities not designated for removal, relocation or
replacement in the course of construction.
D. Comply with all applicable laws, ordinances, rules, regulations and orders of any public body
having jurisdiction for the safety of persons or property or to protect them from damage, injury
or loss; and erect and maintain all necessary safeguards for such safety and protection.
E. Keep one record copy of all Specifications, Drawings, Addenda, Modifications, Shop Drawings
and samples at the site, in good order and annotated to show all changes made during the